King Smile Mould Technology Limited

richard@kingsmilemould.com
King Smile Mould Technology Limited
Contact Us
Service Hotline:0769-82286621

Contacts:Richard
Support Hotline:13620016082
Fax:0769-39012865
E-email:richard@kingsmilemould.com
sales@kingsmilemould.com

Address(Headquarters):Building K, JingChangDa Industrial Park, ShangWei Village, GuanLan Town, LongHua District, ShenZhen City, GuangDong Province.

Address(Branch): Room 101, No.70, XingYi Road, WuSha Community, ChangAn Town, DongGuan City, GuangDong Province.

Mold Process Step of King Smile Mould

1.   RFQ

Please provide following data when requesting for quotation, and our quotation team will offer a reasonable quotation within 3 days.

Data required: 2D (dwg/dxf/pdf) & 3D (stp/igs/x_t) part drawing, requirement on cavity number, plastic, mould life, surface finish. Please tell us an appointed steel material. If no, we will choose a suitable type based on your requirement on mould life.

2. For RFQ, our technical engineer team can support technical analysis, includes Product issue, mould design.

3. Order

When you are satisfied with our quotation and facility, we can sign contract for cooperation. You can either send PO via email or facsimile.

4. Project Management

A professional English-speaking project engineer will be assigned to follow up the project with you, upon the receipt of PO from you.

Detailed project managing procedure as follows:

1>   Firstly a series of engineering analysis will be carried out to your part drawing, including part &. mould structure analysis and Moldflow analysis etc.. Through analysis we can discover the disfigurement on part design, and propose on improvement, or send modified drawing for your confirmation.

Referenced example:

Lack of mold flow analysis

2> Then we will start 2D mould layout design. Normally it takes 2~4 days to complete, and we will have one day to have an inner design checking and improving before sending the mould layout to you.

3> We will modify the mould layout after receiving your comments, till your approval on the final design.

4> We will start ordering steel and mould base, and start full 3D mould design upon your confirmation letter on our mould design.

5> Normally it takes 2~4 days to complete the 3D mould design. If you need to review, we can send the 3D file to you after design finished.

6> After completing 3D mould design, CNC programming will be followed immediately, and all the 3D component drawings will be transformed to 2D drawings with full mark of dimensions. Our tooling staff will carry on machining according to 2D component drawings.

7> The project engineer will send you a timing plan of the machining two days after your approval on our mould design, and from then a weekly report with live pictures will be sent every Monday.

8> We will record the molding condition of T1(the first trial), take pictures and video of the process. After T1, we will send you samples, meanwhile a inspection report will be provided within 5 days.

9> After T1, our mould engineer will have a first mould checking according to the approved mould drawing. At the same time, we will improve the mould according to our inner review and any feedback from you. Latest samples and inspection report out of T2 will be sent to you for approval.

10> If any specific surface finish is required, upon your approval on the sample, we will arrange to carry out mirror polishing or texture. Afterwards, new samples will be sent to you for viewing and approval.

11> Upon receiving your final confirmation on the sample,  if the mould is going to stay in our workshop for further production, we will preserve it and wait for your production order.  if the mould is going to be exported, we will have final mould checking according to the mould drawing. The mould will be running 4~6 hours without stop after final mould checking, in order to make sure a successful running for future production.

12> To save your time of cleaning the mould after it arrives at your side, we apply W40 colorless antirust oil on the mould surface, and the mould will be vacuum-packed for transportation.

13> Following d0cumentation will be provided together with mould shipment: material certificate of core/cavity and mould base, heat treatment report(for harden steel only); 2D mould drawing in A1 printing; one CD with all 2D and 3D data; molding condition report & sample inspection report from final mould trial.

14> The mould running series production in our workshop. We’ll be according to your request of production, and carry out production follow at ISO9001 & TS16949 quality system strictly.

Contact Us

Contact:Richard

Tel:0769-82286621

Phone:13620016082

Fax:0769-39012865

Address(Headquarters):Building K, JingChangDa Industrial Park, ShangWei Village, GuanLan Town, LongHua District, ShenZhen City, GuangDong Province.

Address(Branch): Room 101, No.70, XingYi Road, WuSha Community, ChangAn Town, DongGuan City, GuangDong Province

Follow us

COPYRIGHTS©2017 King Smile Mould Technology Limited ALL RIGHTS RESERVED 备案号:粤ICP备17049167号